Speaker's Profile
Jon Namba
Jon Namba is Executive Director of CFI and a Master II installer. He is a recent past president of CFI and former technical director of the World Floor Covering Association (WFCA). Jon is experienced in all aspects of flooring and is a columnist for Floor Covering Installer magazine.
16 Results Found, Showing 1 - 16
Sort By:
Session Identification
Session Title
Session Date - Earliest First
Session Date - Latest First
View:
Detailed Listing
Simplified Listing
Filter By:
Date/Time
Conference
Keyword
My Content
MO07S - Proper Substrate Preparation for Hardwood, Bamboo & Laminate
Date/Time:
January 28, 2013 11:00am - 12:30pm
Format:
Synched Audio / Video / Slides
TU02S - Proper Substrate Preparation for Hardwood, Bamboo and Laminate
Date/Time:
January 24, 2012 8:00am - 9:30am
Format:
Synched Audio / Video / Slides
WE22S - Proper Substrate Preparation for Hardwood, Bamboo & Laminate
Date/Time:
January 26, 2011 4:00pm - 5:30pm
WMN01 - Common Causes and Corrections for Installation Failures
Date/Time:
February 3, 2010 12:00pm - 1:00pm
Length:
57m 17s -
1 Slide
WMN01 - Common Causes and Corrections for Installation Failures
Date/Time:
February 3, 2010 12:00pm - 1:00pm
Length:
57m 17s -
1 Slide
WE28 - The Truth Behind Warranties - Can You Handle It?
Date/Time:
February 4, 2009 4:00pm - 5:30pm
Length:
01h 01m 37s -
1 Slide
WE28 - The Truth Behind Warranties - Can You Handle It?
Date/Time:
February 4, 2009 4:00pm - 5:30pm
Length:
01h 01m 37s -
1 Slide
FR02 - Common Causes of Post-Installation Failures
Date/Time:
February 1, 2008 8:00am - 9:30am
Length:
01h 22m 24s -
1 Slide
FR02 - Common Causes of Post-Installation Failures
Date/Time:
February 1, 2008 8:00am - 9:30am
Length:
01h 22m 24s -
1 Slide
IS08 - Name That Tool
Date/Time:
February 1, 2008 1:00pm - 2:00pm
IS08 - Name That Tool
Date/Time:
February 1, 2008 1:00pm - 2:00pm
SA36 - Mixing Stone with Other Media
Date/Time:
March 24, 2007 8:30am - 9:45am
Length:
01h 20m 53s -
3 Slides
FR41 - Common Causes of Post-Installation Failures
Date/Time:
February 9, 2007 8:00am - 9:30am
Length:
01h 27m 58s -
30 Slides
FR41 - Common Causes of Post-Installation Failures
Date/Time:
February 9, 2007 8:00am - 9:30am
Length:
01h 27m 58s -
30 Slides
IS05 - Laminate Repairs
Date/Time:
February 8, 2007 3:30pm - 4:30pm
IS05 - Laminate Repairs
Date/Time:
February 8, 2007 3:30pm - 4:30pm